the Solar Guy CONSULTING

I design and install solar.
And I build the businesses that deliver it.

Solar, battery and home energy systems for homes and small commercial sites across Surrey and the South East. And, for contractors and delivery businesses, the certification, standards and installer capability it takes to do the same at scale.

For companies

The capability behind the panels. Built in, or bought in.

Most firms can win solar work faster than they can deliver it. The gap is never the panels. It is certification, competence, standards that survive an audit, and knowing who carries which duty when something goes wrong.

Inside the business

  • Certification route and certification body selection, including where MCS is legally required and where it is simply the credential procurement asks for
  • Quality management system, including documented control of subcontractors
  • What competence can be trained in, and what has to be bought in or subcontracted
  • The sized opportunity and the business case, before the investment is committed

Across the network

  • Installer partners sourced, vetted and onboarded against a written accreditation standard
  • MCS, NICEIC and NAPIT scope, G98 and G99 connection processes, CDM duty holders
  • Commercial terms, SLAs and the payment reality underneath them
  • KPIs, scorecards, review cadence, and reporting to the board on coverage and risk

Case studies

Kight PowerHub · Battery storage, social housing

A national installer network, and everything underneath it

Kight PowerHub designs and manufactures home battery storage systems, sold mainly to social landlords and installed through approved partners. They needed a nationwide installer network, built from nothing, and everything that sits under it.

  • 250+companies researched to reach the partner tiers
  • 28controlled documents inside the ISO build
  • Nationwidecoverage mapped by postcode against live demand

I built the network from first principles, working from a researched list of over 250 companies down to tiered partners, with coverage mapped by postcode area against live sales demand rather than against a map of the country.

Underneath it sits the operating system. The accreditation standard partners are held to, the installer agreement schedules, installation methods, commissioning guide, engineer training syllabus, tenant communication protocol and aftercare schedule. All of it written as controlled documents inside Kight's ISO 9001 and ISO 27001 management system, taken through review and approval with their external ISO consultancy.

The partner portal runs the journey day to day. Partners upload evidence against each accreditation requirement, review is two step, expiring insurance or certificates put new work on hold automatically, homes are issued only to partners still eligible to receive them, and engineers complete install checklists on their phones.

Commercial mechanical and air conditioning contractor

Whether to enter solar and battery storage, and what it would take

A commercial air conditioning and mechanical services contractor, forty years in the trade, wanted to know whether to move into solar and battery storage. Not a pitch for it, an answer either way.

  • £4mof first project value identified, across 77 of their own sites
  • 500+company documents reviewed
  • 5MCS certification bodies assessed

I went through more than 500 of the company's own documents, assessed five MCS certification bodies against how they actually work rather than what they charge, designed seven outline systems on sites the business already holds, and put roughly £4m of first project value across 77 sites. That figure is an estimate built from their own site data, and it is labelled as one in the report.

That became a full scope business plan for the new department. The certification route, the electrical delivery route through partners rather than hiring in, a third party funded route for customers without the capital, the cost, the timeline and a phased implementation.

Large private residential installation

A year of data, and a system quietly losing money

A large private residential system, 40kW of PV across five inverters with 69kWh of storage, was not doing what the owner expected.

  • 40kWof PV across five inverters
  • 69kWhof battery storage
  • £1,500 to £4,500estimated lost value a year

A full year of monitoring data showed the batteries were being filled overnight from the grid every night, which left nowhere for the solar to go the following day. I proved it with a live test on site rather than inferring it from the data alone.

The lost value is an estimate of £1,500 to £4,500 a year, and the range is that wide because it moves with the tariff and the season.

For homeowners

For homeowners

Independent survey

A proper survey and system design from £275, and the spec is yours. Take it to any installer you like. If I install it, the design is already paid for.

For homeowners

Installation

Full install for homes and small commercial sites, done to the standard the design deserves.

For any system

Monitoring

Solar rarely fails loudly. It quietly underperforms for years. Ongoing proactive monitoring that catches it early, whoever installed the system.

Simon Pritchard

Simon Pritchard

Time-served electrician, apprentice to director, 25 years
Built a £1.4M contracting business · Operations Director of a three-region renewables group
Now interim Installer Network Manager at Kight PowerHub, building their national Tier 1 installer network
Battery storage and home energy management (BESS and HEMS) across residential and commercial sites
C&G 2372 PV · C&G 2391 Inspection & Testing · 18th Edition · G99 & G100

25 years in the electrical trade, from apprentice to director. I founded and built Electec Electrical over 12 years to £1.4M in annual revenue. I co-founded Jellyfish Solar, a renewables startup. I was Operations Director at Upvolt, a renewables group built by acquiring regional installers, where I led the first UK deployment of gridX, a BESS and HEMS platform new to the British market.

JIB ECS Installation Technician Grade · C&G 2391 Inspection and Testing · C&G 2372 PV · BS7671 18th Edition · G99 and G100 grid connection

Request the CV

Get in touch

The full site is on its way. Until then, tell me what you need and I'll come back to you.

or email simon@sythesolarguy.co.uk
or call 07784 701813

Thanks, that's come through.

I'll get back to you shortly. If it's urgent, email simon@sythesolarguy.co.uk directly.